• Home
  • Services
    • Heritage and Archaeological Consultancy
    • Archaeological Fieldwork Services
    • Specialist and post-excavation services
  • About us
    • Rubicon Team
    • Fair Pay and Career Development
    • Health and Safety
    • Privacy Policy
  • Vacancies
    • UK
    • Ireland
    • Germany
  • Germany
  • Media
  • Contact
  • News
Rubicon Archaeology
  • Home
  • Services
    • Heritage and Archaeological Consultancy
    • Archaeological Fieldwork Services
    • Specialist and post-excavation services
  • About us
    • Rubicon Team
    • Fair Pay and Career Development
    • Health and Safety
    • Privacy Policy
  • Vacancies
    • UK
    • Ireland
    • Germany
  • Germany
  • Media
  • Contact
  • News

Archaeological Monitoring on the Upper Liffey Valley Sewerage Scheme, Co. Kildare

Rubicon have undertaken archaeological monitoring in the vicinity of Sallins, Clane, Naas, and Newbridge in Co. Kildare in association with the Upper Liffey Valley Sewerage Scheme (ULVSS) – Phase 3 – Contract 2B – Network. The works include the provision of new gravity sewers and rising mains using both traditional and trenchless construction methods; the provision of storm water storage at three pumping stations; and the upgrading of two pumping stations. The contract also includes the operation of two existing pumping stations during construction and two proposed pumping stations following completion. The completed scheme aims to provide a collection network which is in line with modern practices and compliant with current environmental legislation and sustainability principles.
Picture
ULVSS upgrade works at the pumping station in Clane, Co. Kildare

ENERGY AND WATER FEATURED PROJECTS 

River Dodder Flood Alleviation Scheme, Dublin
​A wind farm at Glenough, Co. Tipperary
River Liffey Flood Protection Scheme, Dublin
Dublin Region Watermains Rehabilitation Project
​North Docklands Sewerage Scheme, Dublin

This section will not be visible in live published website. Below are your current settings:


Current Number Of Columns are = 2

Expand Posts Area =

Gap/Space Between Posts = 10px

Blog Post Style = card

Use of custom card colors instead of default colors =

Blog Post Card Background Color = current color

Blog Post Card Shadow Color = current color

Blog Post Card Border Color = current color

Publish the website and visit your blog page to see the results

Picture
Copyright© 2025 Rubicon Archaeology Limited. 
All rights reserved.


  • Home
  • Services
    • Heritage and Archaeological Consultancy
    • Archaeological Fieldwork Services
    • Specialist and post-excavation services
  • About us
    • Rubicon Team
    • Fair Pay and Career Development
    • Health and Safety
    • Privacy Policy
  • Vacancies
    • UK
    • Ireland
    • Germany
  • Germany
  • Media
  • Contact
  • News